back to list

Refurbishment K, Hamburg 2023 - 2026

A young family is moving into a two-storey flat in a turn-of-the-century flat.

Over the decades, the flat had been heavily altered by previous residents and was, in terms of both design and technical features, stuck in the 1980s.

There were many challenges, such as the staircase’s layout in relation to the kitchen, heritage protection requirements and structural integrity.


The flat was thoroughly refurbished and the floor plan carefully optimised to meet the new requirements. The conservatory, which had been added in the 1980s, was removed to enlarge the living area. All floors were replaced and underfloor heating installed. The centrally located staircase was completely refurbished and its run straightened. The new folded steel staircase extends delicately over the kitchen.

The new, modern flat blends harmoniously with the existing structure.

Details

Private flat, 150 m²; service phases 1–3 and, in part, 5–7

Refurbishment K: New kitchen with folded steel staircase Refurbishment K: Kitchen and stairwell during renovation Refurbishment K: Steel staircase between kitchen and upper floor Refurbishment K: Detail of the staircase structure Refurbishment K: Kitchen looking towards the conservatory Refurbishment K: Dining area in the conservatory Refurbishment K: Conservatory with dining table Refurbishment K: Hallway on the upper floor Refurbishment K: Remodelled bathroom Refurbishment K: Guest toilet with natural light Refurbishment K: Bathroom with round mirror Refurbishment K: Shower and washbasin in the bathroom Refurbishment K: Bright hallway with wooden floor Refurbishment K: Vanity and fitted elements in the bathroom Refurbishment K: Bathtub beneath the window Refurbishment K: Shower with natural stone surfaces Refurbishment K: Before-and-after view of the kitchen